Zero Infrastructure Prep

No modification to your facility needed.

Screenshot 2026-01-24 143716.jpg
HRM-4 (Hypotherm Rack Mounted Solution)
Instant Testing, Zero Hassle

Zero Infrastructure Prep

 

Real Workload Testing

 

Immediate ROI Insights

 

Mobile & Repeatable

 

Fully Self-Contained

 

Rapid Deployment
 

Dripless couplings cassettes

4kW heat exchanger Natural flow

Compute frame attached to lit

IP66 smart cable management system

Frontside

connections

A9z6z3kf_rc7tl9_890.jpg

Dripless couplings for link data center

P o w e r  U s a g e  E f f e c t i v e n e s s
( P U E )
PUE = Total Facility Power divided by the IT Equipment Power

Total Facility Power: The total power consumed by the data
center, including IT equipment, cooling systems, lighting, etc.

IT Equipment Power: The power consumed solely by the IT
equipment, such as servers, storage devices, networking
equipment, etc.